The objective of this component is to enhance the capabilities of the implementing entities in managing disaster risks, enhancing preparedness, and achieving resilient recovery. This component will entail the following:
Sub-component 5.1: Capacity building for disaster management To finance strengthening of the disaster management systems in the region by augmenting the capacity of stakeholders and institutions. The activities will include:
i. capacity building of the state disaster management authority by strengthening its institutional and organizational structure, staffing, and resources and funding of training programs and regular drills for the emergency operations center staff and Disaster Management Officers at various levels;
ii. strengthening the Disaster Response Force;
iii. setting up a Decision Support System (DSS) and Emergency Operation Centers to integrate and analyze information from multiple sources in an integrated geo-spatial system.
Sub-component 5.2: Technical support for risk reduction and response preparedness To finance activities such as:
i. Preparation of a Hydro-meteorological Resilience Action Plan focusing on extreme weather events to develop resilience solutions/recommendations and a robust, fail-safe EWS in the region including optimum use of strengthened networks and facilities;
ii. River Morphology Study for some key rivers impacted by the disaster and to analyze and identify critical protective infrastructure works needed for river bank strengthening;
iii. Urban vulnerability assessment study with specific focus on seismic risk mitigation to undertake detailed urban vulnerability analysis and model various risks for effective mitigation planning and disaster response preparedness;
iv) Upgrading design guidelines and material specification for construction in seismic zones in order to carry out an update of current construction design standards and material specifications to align them with national and international best practices;
v) Disaster Risk Financing and Insurance (DRFI) to work out options to increase the resilience of the PIE’s financial response capacity to secure cost-effective access to adequate funding for emergency response, reconstruction, and recovery.
Component-5 :
(5.1) - Capacity Building for Disaster Management (USD 17 MN; INR 102 Crores)
(5.2) - Technical Support for risk reduction & response preparedness (USD 8 MN; INR 48 Crores)
S.No | Name of the work | Estimated Cost in Crore INR |
---|---|---|
1 | Package-01 (Rescue equipments: Angle cutter, circular saw, Gas cutter, Ragulator for gas cutter, Rubber pin duplin, Diamon chain saw, Multi cable winch, Personal alert safety system, Hayraulic jack, Ramset, Combination cutter/spreader, Air lifting bag, Come-along | 6.713 |
2 | Phase-I: (Inflatable rubber boats woth OBM 25 HP, Fibre motorized boats with OBM 75 HP, seating capacity 12 persons (30 Nos) | 4.05 |
3 | Package-02: (Inflatable rubber boats woth OBM 25 HP, Fibre motorized boats with OBM 75 HP, seating capacity 12 persons (28 Nos) | 3.54 |
4 | Rope delivery guns | 2.32 |
5 | Supply of lifebuoy tubes (Lot 1) | 0.125 |
Supply of life saving jackets (Lot 2) | 0.02 | |
6 | Supply of underwater video cameras-5 Nos | 1.18 |
7 | Supply of floating pumps | 1.3248 |
8 | Supply of 20 Nos. portable dewatering pumps | 0.4 |
9 | Package-03: Supply of inflatable lighting towers | 0.66 |
10 | Supply of 05 KVA portable diesel gensets (22 no) | 0.29 |
11 | Package-04: Supply of mobile snow cutting machines | 0.1 |
12 | Package-05: Supply chesis and fabrication of rescue fitted with ladder inflable lighting towers, generators, cable winch and racks etc | 5.57 |
Augmentation of Training centres of SDRF | 1.5 | |
13 | Package-01: Supply of chesis and fabrication of Mutipurpose fire tenders, , Medium weight quick response vehicles (Lot 1 & 2) | 9.1 |
Supply of Regular fire tenders (Lot 3) | 3.26 | |
14 | Package-02: Supply of following equipments: Hydraulic spreader cutter/combi tools, Ramps/hydraulic jacks, fire entry suits, fire proximity suits, breating apparatus sets, water jet blankets | 2.127 |
15 | Procurement of search and rescue kits for PRIs by PMU. | 20 |
16 | SUPPLY, INSTALLATION & COMMISSIONING OF AUTOMATIC WATER LEVEL RADAR, WATER VELOCITY RADAR SENSORS, ACOUSTIC DOPPLER CURRENT PROFILER, AUTOMATIC WEATHER STATIONS (AWS), AUTOMATIC RAIN GAUGES (ARG), AUTOMATIC SNOW GAUGES (ASG) WITH THREE YEARS WARRANTY AND SEVEN YEARS COMPREHENSIVE AMC IN THE STATE OF JAMMU & KASHMIR. | 88 |
17 | Setting up of EOC/ Central control building | 17 |
18 | Consultancy for River Morphology Study-JHELUM River Basin | 17.19 |
19 | Procurement of Consultancy for River Morphology Study-TAWI River Basin | 16.89 |
20 | Consultancy for preparing the building codes | 2 |
21 | Consultancy for Risk Assessment | 20.61 |
22 | Setting up of State DSS | 10 |
23 | Consultancy forTraining and Capacity Building | 3.9 |
24 | Training and Capacity Building SDRF / NIDM / IMPA / KU / JU) | 8 |