Strengthening disaster risk management capacity

The objective of this component is to enhance the capabilities of the implementing entities in managing disaster risks, enhancing preparedness, and achieving resilient recovery. This component will entail the following:
Sub-component 5.1: Capacity building for disaster management To finance strengthening of the disaster management systems in the region by augmenting the capacity of stakeholders and institutions. The activities will include:
i. capacity building of the state disaster management authority by strengthening its institutional and organizational structure, staffing, and resources and funding of training programs and regular drills for the emergency operations center staff and Disaster Management Officers at various levels;
ii. strengthening the Disaster Response Force;
iii. setting up a Decision Support System (DSS) and Emergency Operation Centers to integrate and analyze information from multiple sources in an integrated geo-spatial system.
Sub-component 5.2: Technical support for risk reduction and response preparedness To finance activities such as:

i. Preparation of a Hydro-meteorological Resilience Action Plan focusing on extreme weather events to develop resilience solutions/recommendations and a robust, fail-safe EWS in the region including optimum use of strengthened networks and facilities;
ii. River Morphology Study for some key rivers impacted by the disaster and to analyze and identify critical protective infrastructure works needed for river bank strengthening;
iii. Urban vulnerability assessment study with specific focus on seismic risk mitigation to undertake detailed urban vulnerability analysis and model various risks for effective mitigation planning and disaster response preparedness;
iv) Upgrading design guidelines and material specification for construction in seismic zones in order to carry out an update of current construction design standards and material specifications to align them with national and international best practices;
v) Disaster Risk Financing and Insurance (DRFI) to work out options to increase the resilience of the PIE’s financial response capacity to secure cost-effective access to adequate funding for emergency response, reconstruction, and recovery.

Component-5 :

(5.1) - Capacity Building for Disaster Management (USD 17 MN; INR 102 Crores)
(5.2) - Technical Support for risk reduction & response preparedness (USD 8 MN; INR 48 Crores)

S.NoName of the workExecuting AgencyEstimated Cost in Crore INRExpdtt. IncurredStatus/Issues
1Package-01 (Rescue equipments: Angle cutter, circular saw, Gas cutter, Ragulator for gas cutter, Rubber pin duplin, Diamon chain saw, Multi cable winch, Personal alert safety system, Hayraulic jack, Ramset, Combination cutter/spreader, Air lifting bag, Come-along6.713Supply is complete
2Phase-I: (Inflatable rubber boats woth OBM 25 HP, Fibre motorized boats with OBM 75 HP, seating capacity 12 persons (30 Nos)4.05Equipments Received
3Package-02: (Inflatable rubber boats woth OBM 25 HP, Fibre motorized boats with OBM 75 HP, seating capacity 12 persons (28 Nos)3.54Supply completed.
4Rope delivery guns2.32Supply Completed
5Supply of lifebuoy tubes (Lot 1)0.125Supply completed
Supply of life saving jackets (Lot 2)0.02Supply completed
6Supply of underwater video cameras-5 Nos1.18Supply completed
7Supply of floating pumps1.3248Awarded.
8Supply of 20 Nos. portable dewatering pumps0.4Procurement through GeM in process
9Package-03: Supply of inflatable lighting towers0.66Supply completed
10Supply of 05 KVA portable diesel gensets (22 no)0.29Supply Completed.
11Package-04: Supply of mobile snow cutting machines0.1Supply completed.
12Package-05: Supply chesis and fabrication of rescue fitted with ladder inflable lighting towers, generators, cable winch and racks etc5.57Awarded. 8 Vehicles supplied. 8 more vehicles ready for inspection.
Augmentation of Training centres of SDRF1.5Proposal awaited from SDRF
13Package-01: Supply of chesis and fabrication of Mutipurpose fire tenders, , Medium weight quick response vehicles (Lot 1 & 2)9.1Awarded.
Supply of Regular fire tenders (Lot 3)3.26Awarded.
14Package-02: Supply of following equipments: Hydraulic spreader cutter/combi tools, Ramps/hydraulic jacks, fire entry suits, fire proximity suits, breating apparatus sets, water jet blankets2.127Supply completed
15Procurement of search and rescue kits for PRIs by PMU.20Retendered.Last date of bid submission 7-07-2020
16SUPPLY, INSTALLATION & COMMISSIONING OF AUTOMATIC WATER LEVEL RADAR, WATER VELOCITY RADAR SENSORS, ACOUSTIC DOPPLER CURRENT PROFILER, AUTOMATIC WEATHER STATIONS (AWS), AUTOMATIC RAIN GAUGES (ARG), AUTOMATIC SNOW GAUGES (ASG) WITH THREE YEARS WARRANTY AND SEVEN YEARS COMPREHENSIVE AMC IN THE STATE OF JAMMU & KASHMIR.88Draft SBD cleared by WB procurement notice being issued.
17Setting up of EOC/ Central control building17Awarded.(Under force account JKPCC).Design under finalization .
18 Consultancy for River Morphology Study-JHELUM River Basin17.19ask-2 conduct data collection complete submitted.under review.overall progress 18%.
19Procurement of Consultancy for River Morphology Study-TAWI River Basin16.89Task- 4 under Review.overall progress 30%
20Consultancy for preparing the building codes2Awarded. Task(1, 2, 3 & 4 & 5th) submitted and is under review..Overall progress 55%
21 Consultancy for Risk Assessment20.61Task 3 and Task 4 reviewed on 16-03-2020. Revised Report to be submitted by RMSI.
22Setting up of State DSS10Contract signed on 10-06-2020
23Consultancy forTraining and Capacity Building3.9EOI Under Evaluation
24Training and Capacity Building SDRF / NIDM / IMPA / KU / JU)8Trainings being imparted by SDRF / NIDM / IMPA / KU / JU. Hiring of consultant for capacity building also initiated.