The objective of this component is to enhance the capabilities of the implementing entities in managing disaster risks, enhancing preparedness, and achieving resilient recovery. This component will entail the following:
Sub-component 5.1: Capacity building for disaster management To finance strengthening of the disaster management systems in the region by augmenting the capacity of stakeholders and institutions. The activities will include:
i. capacity building of the state disaster management authority by strengthening its institutional and organizational structure, staffing, and resources and funding of training programs and regular drills for the emergency operations center staff and Disaster Management Officers at various levels;
ii. strengthening the Disaster Response Force;
iii. setting up a Decision Support System (DSS) and Emergency Operation Centers to integrate and analyze information from multiple sources in an integrated geo-spatial system.
Sub-component 5.2: Technical support for risk reduction and response preparedness To finance activities such as:
i. Preparation of a Hydro-meteorological Resilience Action Plan focusing on extreme weather events to develop resilience solutions/recommendations and a robust, fail-safe EWS in the region including optimum use of strengthened networks and facilities;
ii. River Morphology Study for some key rivers impacted by the disaster and to analyze and identify critical protective infrastructure works needed for river bank strengthening;
iii. Urban vulnerability assessment study with specific focus on seismic risk mitigation to undertake detailed urban vulnerability analysis and model various risks for effective mitigation planning and disaster response preparedness;
iv) Upgrading design guidelines and material specification for construction in seismic zones in order to carry out an update of current construction design standards and material specifications to align them with national and international best practices;
v) Disaster Risk Financing and Insurance (DRFI) to work out options to increase the resilience of the PIE’s financial response capacity to secure cost-effective access to adequate funding for emergency response, reconstruction, and recovery.
Component-5 :
(5.1) - Capacity Building for Disaster Management (USD 17 MN; INR 102 Crores)
(5.2) - Technical Support for risk reduction & response preparedness (USD 8 MN; INR 48 Crores)
S.No | Name of the work | Executing Agency | Estimated Cost in Crore INR | Expdtt. Incurred | Status/Issues |
---|---|---|---|---|---|
1 | Package-01 (Rescue equipments: Angle cutter, circular saw, Gas cutter, Ragulator for gas cutter, Rubber pin duplin, Diamon chain saw, Multi cable winch, Personal alert safety system, Hayraulic jack, Ramset, Combination cutter/spreader, Air lifting bag, Come-along | 6.713 | Supply is complete | ||
2 | Phase-I: (Inflatable rubber boats woth OBM 25 HP, Fibre motorized boats with OBM 75 HP, seating capacity 12 persons (30 Nos) | 4.05 | Equipments Received | ||
3 | Package-02: (Inflatable rubber boats woth OBM 25 HP, Fibre motorized boats with OBM 75 HP, seating capacity 12 persons (28 Nos) | 3.54 | Supply completed. | ||
4 | Rope delivery guns | 2.32 | Supply Completed | ||
5 | Supply of lifebuoy tubes (Lot 1) | 0.125 | Supply completed | ||
Supply of life saving jackets (Lot 2) | 0.02 | Supply completed | |||
6 | Supply of underwater video cameras-5 Nos | 1.18 | Supply completed | ||
7 | Supply of floating pumps | 1.3248 | Awarded. | ||
8 | Supply of 20 Nos. portable dewatering pumps | 0.4 | Procurement through GeM in process | ||
9 | Package-03: Supply of inflatable lighting towers | 0.66 | Supply completed | ||
10 | Supply of 05 KVA portable diesel gensets (22 no) | 0.29 | Supply Completed. | ||
11 | Package-04: Supply of mobile snow cutting machines | 0.1 | Supply completed. | ||
12 | Package-05: Supply chesis and fabrication of rescue fitted with ladder inflable lighting towers, generators, cable winch and racks etc | 5.57 | Awarded. 8 Vehicles supplied. 8 more vehicles ready for inspection. | ||
Augmentation of Training centres of SDRF | 1.5 | Proposal awaited from SDRF | |||
13 | Package-01: Supply of chesis and fabrication of Mutipurpose fire tenders, , Medium weight quick response vehicles (Lot 1 & 2) | 9.1 | Awarded. | ||
Supply of Regular fire tenders (Lot 3) | 3.26 | Awarded. | |||
14 | Package-02: Supply of following equipments: Hydraulic spreader cutter/combi tools, Ramps/hydraulic jacks, fire entry suits, fire proximity suits, breating apparatus sets, water jet blankets | 2.127 | Supply completed | ||
15 | Procurement of search and rescue kits for PRIs by PMU. | 20 | Retendered.Last date of bid submission 7-07-2020 | ||
16 | SUPPLY, INSTALLATION & COMMISSIONING OF AUTOMATIC WATER LEVEL RADAR, WATER VELOCITY RADAR SENSORS, ACOUSTIC DOPPLER CURRENT PROFILER, AUTOMATIC WEATHER STATIONS (AWS), AUTOMATIC RAIN GAUGES (ARG), AUTOMATIC SNOW GAUGES (ASG) WITH THREE YEARS WARRANTY AND SEVEN YEARS COMPREHENSIVE AMC IN THE STATE OF JAMMU & KASHMIR. | 88 | Draft SBD cleared by WB procurement notice being issued. | ||
17 | Setting up of EOC/ Central control building | 17 | Awarded.(Under force account JKPCC).Design under finalization . | ||
18 | Consultancy for River Morphology Study-JHELUM River Basin | 17.19 | ask-2 conduct data collection complete submitted.under review.overall progress 18%. | ||
19 | Procurement of Consultancy for River Morphology Study-TAWI River Basin | 16.89 | Task- 4 under Review.overall progress 30% | ||
20 | Consultancy for preparing the building codes | 2 | Awarded. Task(1, 2, 3 & 4 & 5th) submitted and is under review..Overall progress 55% | ||
21 | Consultancy for Risk Assessment | 20.61 | Task 3 and Task 4 reviewed on 16-03-2020. Revised Report to be submitted by RMSI. | ||
22 | Setting up of State DSS | 10 | Contract signed on 10-06-2020 | ||
23 | Consultancy forTraining and Capacity Building | 3.9 | EOI Under Evaluation | ||
24 | Training and Capacity Building SDRF / NIDM / IMPA / KU / JU) | 8 | Trainings being imparted by SDRF / NIDM / IMPA / KU / JU. Hiring of consultant for capacity building also initiated. |