The objective of this component is to restore and improve the connectivity disrupted due to the disaster through the reconstruction of damaged roads and bridges. The infrastructure will be designed to withstand earthquake and flood forces as per the latest official design guidelines. The affected areas will benefit by the restored access to markets thereby increasing the economic growth in these areas and timely access to health and education services. Restoration of roads will also serve as supply/rescue lines in the event of a disaster.
The component will finance the reconstruction of damaged roads, bridges and associated drainage and slope stabilization works, retaining walls, breast walls and other structures to increase resilience.
Component 2 - Construction of Roads & Bridges (USD 80 Mn ; INR 480 Crores)
S. No Name of the work Estimated Cost in Crore INR 1 Widening up-gradation of Amberpora Haritar Akhoonpora road Baramulla 8.375 2 Construcion of Halmullah Punchpora Kralkut road Sangam Bijbehara district Anantnag 4.98 3 Construction of Littter Pulwama road 3.36 4 Construction of Rohmoo Bridge 21.25 5 Construction of Trenz Bridge 34.5 6 Construction of 1x50 m span trussed Girder steel Girder bridge over Frastharnallah at Waza Mohalla Kreeri at Baramulla 7.4 7 Construction of 1X50m trussed grider over Niglinallah at Shrakhwara on Putkhah Wagoora Barmulla 6.7 8 Construction of 1x25.2 m span plate Girder steel lane bridge over nallah sheeshrie on wahdina bandi payeen Baramulla 5.32 9 Construction of 1x25.20 m RCC double lane bridge over nallah ferozpura Baramulla at trikolbal pattan Baramulla 6.31 10 Construction of 1x19.20 m plate girder double lane steel bridge over niglinallah at ghogidaji Baramulla 6.27 11 Construction of 1x50 span trussed girder double lane steel bridge over ningli nallah a wagila wagoora Baramulla 8.66 12 Construction of steel truss girder bridge 3x 30 m at Asajipora Kamad Sadoora Road km 4th 6.31 13 Kalaiban Bridge 2.63 14 Construction of 2 lane single span 110 m bridge over nallah sindh at Wayil Ganderbal 23.79 15 Construction of bridge of Kulgam Chamund road Km-Ist RD-700 32.4 16 Construction of 1x45 Mtr trussed girder bridge over nallah Rambiara at Kumar Mohalla Watchi 3.11 4th Tawi Bridge including construction of Protection works ( A1 & A2) 0 17 43M span steel deck bridg over Anji Nallah at Sukhal Ghat,Reasi (complete job) 1,22 18 Const. of 165 M (3x55m) span bridge double lane brigde over Betar nallah at village Dhallan 18 19 58 m span motorable bridge over Katheel Ganjoo to Barsoa over Ghordi nallah and 50 m span motorable bridge from Barso to Pathri over Barmeen nallah Ramnagar Udhampur 13.24 20 Construction of roads (Kadlabal Lasjan Rambagh Road)-Package-1 126 21 Construction of roads (Pampore Pulwama Road)-Package-1 22 Construction of roads (Hamaray Sultanpora Nowgam to Sumbul Bridge, Shadipura Khanpeth Sumbal road, Hajin Ajas Via Saidnara )-Package-2 31.89 23 Construction of roads (Rigid Pavement of IG Road Rambagh to Civil Secretariat in Srinagar districtPackage-3 42.52 24 Construction of roads ( Rigid Pavement of Eastern Foreshore road, )-Package-3 25 Construction of roads (Rigid Pavement of IG Road Peerbagh Bridge to Humhama Chowk in Srinagar)-Package-3 26 Construction of roads ( Parimpora Soibugh in Budgam)-Package-3 27 Construction of Roads (Sangam Khudwani Road, & Bijbehara waghama via katriteng Road. )-Package-4 28 Construction of Roads ( Sidhra-Surinsar Road (Lot 1)
42.54 29 2. Tutan Di Khui to Khada-Madana Road (Lot 2) 30 Construction of Roads (Chiralla Link Road and
2. Malaini-Chakrabatti Road)-Package-2 35 31 Construction of Roads (Malaini-Chakrabatti Road)-Package-2 32 Construction of Roads (Gulati to Shadra Sharief)-Package-3 38.97 33 Construction of Roads (Anji Panasa Road , Deva Mai Ohli Mandir)-Package-4 16.04
S. No | Name of the work | Estimated Cost in Crore INR |
---|---|---|
1 | Widening up-gradation of Amberpora Haritar Akhoonpora road Baramulla | 8.375 |
2 | Construcion of Halmullah Punchpora Kralkut road Sangam Bijbehara district Anantnag | 4.98 |
3 | Construction of Littter Pulwama road | 3.36 |
4 | Construction of Rohmoo Bridge | 21.25 |
5 | Construction of Trenz Bridge | 34.5 |
6 | Construction of 1x50 m span trussed Girder steel Girder bridge over Frastharnallah at Waza Mohalla Kreeri at Baramulla | 7.4 |
7 | Construction of 1X50m trussed grider over Niglinallah at Shrakhwara on Putkhah Wagoora Barmulla | 6.7 |
8 | Construction of 1x25.2 m span plate Girder steel lane bridge over nallah sheeshrie on wahdina bandi payeen Baramulla | 5.32 |
9 | Construction of 1x25.20 m RCC double lane bridge over nallah ferozpura Baramulla at trikolbal pattan Baramulla | 6.31 |
10 | Construction of 1x19.20 m plate girder double lane steel bridge over niglinallah at ghogidaji Baramulla | 6.27 |
11 | Construction of 1x50 span trussed girder double lane steel bridge over ningli nallah a wagila wagoora Baramulla | 8.66 |
12 | Construction of steel truss girder bridge 3x 30 m at Asajipora Kamad Sadoora Road km 4th | 6.31 |
13 | Kalaiban Bridge | 2.63 |
14 | Construction of 2 lane single span 110 m bridge over nallah sindh at Wayil Ganderbal | 23.79 |
15 | Construction of bridge of Kulgam Chamund road Km-Ist RD-700 | 32.4 |
16 | Construction of 1x45 Mtr trussed girder bridge over nallah Rambiara at Kumar Mohalla Watchi | 3.11 |
4th Tawi Bridge including construction of Protection works ( A1 & A2) | 0 | |
17 | 43M span steel deck bridg over Anji Nallah at Sukhal Ghat,Reasi (complete job) | 1,22 |
18 | Const. of 165 M (3x55m) span bridge double lane brigde over Betar nallah at village Dhallan | 18 |
19 | 58 m span motorable bridge over Katheel Ganjoo to Barsoa over Ghordi nallah and 50 m span motorable bridge from Barso to Pathri over Barmeen nallah Ramnagar Udhampur | 13.24 |
20 | Construction of roads (Kadlabal Lasjan Rambagh Road)-Package-1 | 126 |
21 | Construction of roads (Pampore Pulwama Road)-Package-1 | |
22 | Construction of roads (Hamaray Sultanpora Nowgam to Sumbul Bridge, Shadipura Khanpeth Sumbal road, Hajin Ajas Via Saidnara )-Package-2 | 31.89 |
23 | Construction of roads (Rigid Pavement of IG Road Rambagh to Civil Secretariat in Srinagar districtPackage-3 | 42.52 |
24 | Construction of roads ( Rigid Pavement of Eastern Foreshore road, )-Package-3 | |
25 | Construction of roads (Rigid Pavement of IG Road Peerbagh Bridge to Humhama Chowk in Srinagar)-Package-3 | |
26 | Construction of roads ( Parimpora Soibugh in Budgam)-Package-3 | |
27 | Construction of Roads (Sangam Khudwani Road, & Bijbehara waghama via katriteng Road. )-Package-4 | |
28 | Construction of Roads ( Sidhra-Surinsar Road (Lot 1) | 42.54 |
29 | 2. Tutan Di Khui to Khada-Madana Road (Lot 2) | |
30 | Construction of Roads (Chiralla Link Road and 2. Malaini-Chakrabatti Road)-Package-2 | 35 |
31 | Construction of Roads (Malaini-Chakrabatti Road)-Package-2 | |
32 | Construction of Roads (Gulati to Shadra Sharief)-Package-3 | 38.97 |
33 | Construction of Roads (Anji Panasa Road , Deva Mai Ohli Mandir)-Package-4 | 16.04 |